GEOBAG SUPPLY + DESIGN · AUSTRALIA-WIDE

Geobag systems planned from slurry data to stacking layout and supply.

Kontain prepares the agreed civil specification, drawings, pad and drainage layout, bag sizing, stack planning and modelling, operating controls and material schedule—then supplies the geobags, liner and associated materials.

Open secured geobag tools
Includedagreed design scope with material supply
Plans + DWGscivil layout and stack geometry
10+ yearsdewatering-system experience
Large geotextile dewatering containers on a lined operating padPROJECT EXPERIENCE · AUSTRALIA

Technical resources · project-specific

Project-specific technical documents

Geobag data and field procedures must match the material, filling system and containment controls. The correct document set is issued after the application review.

This page provides the public feasibility, selection and field-control basis. Kontain does not present one generic geobag TDS as suitable for every slurry or project.

COMMON PROJECT DRIVERS

Recover waterRemove pond sludgeManage dredged sedimentExpand tailings capacityReduce wet haulage

THE COMMERCIAL MODEL

Design and planning are included with the material supply.

Kontain does not add a separate design fee for the agreed geobag scope when appointed to supply the geobags, liner and associated materials. The technical work and supplied products are developed as one package so the specification, layout and order do not drift apart.

Review the transparent design-and-supply model
INCLUDED IN THE AGREED SUPPLY SCOPE
  • Material review, mass balance and treatability plan
  • Bag sizing, fabric, seam and port requirements
  • Civil specification, plans, sections and drawing files
  • Pad, liner, drainage and filtrate-collection layout
  • Stack geometry, lift sequence and modelling where needed
  • Filling controls, hold points and material supply schedule
PERFORMANCE BOUNDARY

Kontain does not guarantee dewatering rate, filtrate quality, final cake solids or programme. Outcomes remain dependent on representative testing, feed variability, chemical conditioning, pumping, weather, drainage and operator control.

The intent is to reduce avoidable design, product and operating risk and maximise the likelihood of a successful outcome using a clear technical basis and fit-for-purpose materials.

01 · FEASIBILITY FIRST

Design the dewatering system before the bags are ordered.

The product is only one input. The commercial outcome is controlled by solids mass, filtration response, polymer demand, available area, water-management constraints, filling rate and the final cake-handling plan.

MINIMUM INPUT DATA

What we need for a useful first assessment

  1. 01
    Material definition

    Slurry source, particle-size distribution, solids concentration, mineralogy, pH and contaminants.

  2. 02
    Hydraulic basis

    Total wet volume, dredge or pump rate, operating hours and the water-return or discharge pathway.

  3. 03
    Site constraints

    Usable footprint, levels, access, liner requirements and the final cake destination.

Send preliminary project data

GO / DEVELOP / NO-GO SCREEN

Questions the proposal must answer

01

Can the solids be retained while producing a manageable filtrate?

02

Can the required dry tonnes fit within the available pad and programme?

03

Is a single layer sufficient, or is engineered stacking required?

04

What testing and regulatory evidence is needed before mobilisation?

05

Which dredging, pumping and polymer package can deliver the design basis?

02 · TECHNICAL DEVELOPMENT

Civil specification, drawings, layout and supply developed together.

Kontain works from concept and testing through to manufacture, delivery and filling support. We do not perform the dredging, pumping or day-to-day operation unless separately agreed; those delivery interfaces are defined so each party works to the same basis.

01

Mass balance & programme

Convert wet volume and solids concentration into dry tonnes, water release, container cycles, pump duty and operating duration.

02

Treatability & conditioning

Plan bench screening, candidate polymers, dose windows, make-down requirements, filtrate objectives and field verification.

03

Civil specification & drawings

Prepare the agreed plans, sections, material requirements, pad levels, drainage details and construction notes from the available project data.

04

Layout & stack planning

Optimise bag orientation, cells, access, headers, drainage, liner protection, lift geometry and filling sequence; model the stack where project conditions warrant it.

05

Bag configuration & manufacture

Set fabric, seam, port, dimensions and handling requirements around the slurry, geometry, load, programme and delivery constraints.

06

Operating basis & interfaces

Define fill controls, hold points and the interfaces between the operator, dredging, pumping, civil, polymer and material-supply scopes.

FOOTPRINT OPTIMISATION

Stack geometry is part of the civil layout—not an operator decision on the day.

Where horizontal area is limited, staged stacking can increase dry-solids capacity per square metre. It is not simply “bags on bags”: lower lifts must consolidate, drainage must remain open, foundation response and stability must be reviewed, and the filling sequence must be controlled.

LayoutOrientation, spacing, cells and access
DrainageFiltrate flow paths maintained at every lift
SequenceConsolidation gates before loading lower layers
StabilityGeometry, seam demand and foundation response

03 · PRODUCT PLATFORM

Three technical starting points. Final selection follows the slurry.

Indicative attributes are shown for portfolio comparison. Project dimensions, port layout and the final fabric specification are confirmed after application review and, where warranted, treatability testing.

KGB 1000HIGH-STRENGTH

Stacked, high-load, coarse-sediment and long-term applications

  • O95 ≈0.45 mm
  • Tensile ≈200 kN/m MD/CD
  • Seam strength >170 kN/m
Request pricing and grade review

O95, permeability and strength values are nominal portfolio descriptors—not a design specification or a guarantee of dewatering performance. Seam and fabric data must be reviewed with container geometry, fill height, stacking and operating controls.

04 · INSTALLATION & FILLING GUIDE

A designed system still depends on disciplined operation.

Pad preparation, alignment, flow, conditioning and permitted fill geometry materially affect results. The procedure sets measurable limits and nominates who can stop filling, but the operator remains responsible for following the agreed controls.

STAGEMINIMUM CONTROLHOLD / RESPONSE TRIGGER
01 · Pad releaseLevel survey, compaction, liner protection, drainage and sump ready.Soft spots, sharp objects, ponding or incomplete containment.
02 · DeploymentCentreline set-out, port orientation, spacing, seams and serial numbers checked.Twist, fold, misalignment, damaged fabric or blocked drainage path.
03 · PrimingLow initial flow, restrained hose, polymer response and filtrate observed.Poor floc, jetting, local hump, cloudy filtrate or unstable hose.
04 · Production fillApproved rate and height, perimeter inspections and balanced filling.Rapid local rise, rolling, seam distress, scour, leakage or height limit.
05 · Consolidation / stackingDrain-down period, geometry survey, lower-lift condition and access verified.Ongoing movement, trapped water, blocked drainage or foundation distress.

PRACTICAL FIELD SEQUENCE

Installation guidance included here

The project procedure should turn the design basis into a short, measurable field sequence used at pre-starts, hold points and shift handovers.

  1. 01
    Prepare and release the pad

    Confirm formation, liner protection, fall, drainage paths, sump capacity, access and exclusion zones before any container is unloaded.

  2. 02
    Unload, identify and deploy

    Lift from approved points, record container serial numbers, set centreline and port orientation, remove folds and inspect fabric and seams.

  3. 03
    Connect the filling system

    Restrain the hose, use compatible fittings, establish isolation and diversion controls, and position personnel clear of pressurised lines.

  4. 04
    Prime at low flow

    Confirm polymer response, filtrate clarity, even container rise and drainage performance before increasing toward the approved operating rate.

  5. 05
    Fill, inspect and record

    Log flow, pressure or fill-height controls, polymer dose, filtrate observations and perimeter condition. Stop for movement, seam distress or abnormal leakage.

  6. 06
    Consolidate before the next cycle

    Allow drain-down, survey geometry and confirm lower-lift stability and open drainage before refilling, stacking or commencing cake removal.

Request a site-specific procedure Kontain can develop the filling procedure, induction material, inspection forms and hold-point records for the project.

06 · RECENT EXPERIENCE

Verified 2026 project examples

Different materials and approval pathways; the same discipline of testing the basis, controlling filling and planning the solids destination before mobilisation.

Geotextile dewatering containers operating on a lined pad

QUEENSLAND · 2026

Abattoir wastewater pond dewatering

24,000 m³ wet → approximately 8,000 m³ cakeA Queensland wastewater pond sludge project using geotextile dewatering containers to reduce wet volume and produce stackable material for handling and disposal.Review project example
Geotextile dewatering containers within a port sediment containment cell

SOUTH AUSTRALIA · 2026

Port dredging sediment dewatering

Two stages · approximately 10,000 m³ in situA two-stage port sediment dewatering basis developed around a constrained wharf footprint, polymer response and marine-discharge controls.Review project example

FROM CONCEPT TO DELIVERY TEAM

Start with the technical basis. Bring the dredging contractor in against a defined scope.

Kontain can connect asset owners with experienced dredging, pumping and dewatering companies from our project network. Our commercial interest in supplying the geobags and associated materials is stated clearly; each party can then price and plan against the same mass balance, layout, trial evidence and operating controls.

  • Performance-based scope suitable for competitive contractor pricing
  • Clear interfaces between civil, dredging, polymer, operation and material supply
  • On-site support during set-up, trials and production filling where agreed

PRELIMINARY PROJECT REVIEW

Send the site and slurry data—not a finished specification.

A short discussion around the material, wet volume, site area, programme and water pathway is enough to identify the next useful step: desktop assessment, sample testing or a site visit.

USEFUL FIRST INPUTS

  • Material or waste stream
  • Approximate wet volume and solids concentration
  • Available footprint or site plan
  • Required programme and water destination