Geosynthetic systems · Australia-wide | Geotechnical services · South AustraliaKontain capability brochure

Civil contractors, estimators & project engineers · Australia-wide

Practical geosynthetic support for civil works.

Send the drawing, specification, quantity or site problem. Kontain helps narrow the system, checks the important evidence and departures, plans the supplied format and delivers project-direct.

Directtechnical contact with Ben
14+ yearsgeotechnical and geosynthetic experience
Project-directmanufacture and Australia-wide delivery
Practicaltender, submittal and field support

Common civil work fronts

Start where cost, compliance or buildability can go wrong.

The right product is only part of the answer. The specification, construction sequence, supplied dimensions, plant access and acceptance evidence all affect the final outcome.

01

Tender pricing & alternatives

Review the specification, drawings and quantities; identify the controlling requirements, genuine alternatives and technical gaps before price is locked.

02

Roads & working platforms

Screen separation, confinement, reinforcement, aggregate thickness, subgrade variability, construction traffic and practical installation.

03

Soft ground & basal reinforcement

Connect ground conditions, settlement mechanism, construction sequence and design tensile demand to the appropriate woven or grid system.

04

Walls, slopes & embankments

Coordinate long-term tensile strength, interaction, facing, drainage, connection details, roll direction and construction staging.

05

Filtration, drainage & protection

Check pore-size compatibility, transmissivity, survivability, chemical environment, load, creep and the interfaces around the geocomposite.

06

Containment & stormwater

Review GCL, protection, drainage and modular tank requirements as a system—including subgrade, penetrations, cover and installation sequence.

How the review works

Fit the system to the job, then make it commercially buildable.

This is where an engineering background matters: not to turn every supply enquiry into a design exercise, but to recognise which inputs genuinely change the answer.

01

Define the mechanism

State what must be separated, filtered, drained, reinforced, stabilised, contained or protected.

02

Find the controlling inputs

Ground, water, loads, geometry, construction method, programme and acceptance criteria.

03

Check the evidence

Use the correct test methods, directions, specimen conditions, reduction factors and durability basis.

04

Plan the supplied format

Roll widths, lengths, overlaps, cuts, container use, handling and delivery sequence affect installed cost.

05

Close the site interface

Installation notes, hold points, inspection and quick technical clarification reduce avoidable rework.

Useful before the quote

Use the tools to test the concept, then send the real project inputs.

The tools support early comparison and clearer questions. They do not replace project-specific design or the appointed engineer's review.

Pricing a civil package?

Send the specification, take-off or drawing. We'll tell you what changes the answer.

Start the project review Email Ben directly