From site need to supplied material
A specification that remains connected to delivery.
Kontain's role is to make the required product, evidence and interfaces clear enough that the site can make an informed procurement decision.
01Define the required function
State the separation, filtration, drainage, reinforcement, containment, protection or dewatering outcome before naming a product.
02Prepare the material requirements
Set relevant properties, test methods, directions, durability, geometry, interfaces, QA evidence and permitted qualifications.
03Make alternatives assessable
Use performance-based criteria where practical so genuine alternatives can be compared on the same evidence rather than excluded by a brand name.
04State the commercial position
Disclose where Kontain intends to supply, explain the supply basis and agree any margin or fee structure before the order.
05Connect supply and accountability
Coordinate manufacture, documentation, freight, warranty route and site support through the Australian contracting supplier.