Tailings management · 100,000–1 million dmt a year
A competitive case for geobags starts with a fair cost comparison.
Geobags dewater and store tailings in the same operation. When filled in their final position, they avoid the separate cake transport, conditioning and placement route that follows mechanical filtration.
Work through the inputs with us
Free to use. More useful with the right project basis.
We strongly recommend reviewing the comparison with Kontain before drawing a project conclusion. We can help your team match dry-tonne capacity, deployment productivity, rate inclusions, storage stages and capital timing.
A presentation gives operations, engineering and commercial teams a shared view of the options. Bring your production schedule, tailings data, available footprint and existing quotations; we can work through the assumptions together.
No sign-in or licence fee
Tailings Cost Comparison
Start with the selected operating costs, then use the full-project view for infrastructure, capital, operating cover, closure and cashflow. All amounts are editable.
Put the complete options beside each other
