Geobag dewatering · Laminated GCLs · Liner supply & technical supportKontain capability brochure

Tailings management · 100,000–1 million dmt a year

A competitive case for geobags starts with a fair cost comparison.

Geobags dewater and store tailings in the same operation. When filled in their final position, they avoid the separate cake transport, conditioning and placement route that follows mechanical filtration.

Work through the inputs with us

Free to use. More useful with the right project basis.

We strongly recommend reviewing the comparison with Kontain before drawing a project conclusion. We can help your team match dry-tonne capacity, deployment productivity, rate inclusions, storage stages and capital timing.

A presentation gives operations, engineering and commercial teams a shared view of the options. Bring your production schedule, tailings data, available footprint and existing quotations; we can work through the assumptions together.

No sign-in or licence fee

Tailings Cost Comparison

Start with the selected operating costs, then use the full-project view for infrastructure, capital, operating cover, closure and cashflow. All amounts are editable.

Understand the inputs. The examples show how to compare costs; they are not a quotation for your site.

Open full-screen calculator ↗

If the embedded view does not load, open the calculator directly. Scenario inputs stay in the calculator’s browser storage; use Save scenario for a portable copy. Contact Kontain when you want the assumptions reviewed. For layout and capacity planning, use the geobag design tool.

Put the complete options beside each other

Review your tailings cost comparison with Kontain.

Arrange a cost review →Read the geobag article →