Real project constraints. Useful evidence. No inflated claims.
These examples record the project basis, response and known outcome. They are not presented as universal performance claims; geosynthetic selection and dewatering performance still depend on the actual material, site and operating controls.

QUEENSLAND · 2026
Abattoir wastewater pond dewatering
24,000 m³ wet → approximately 8,000 m³ cakeA Queensland wastewater pond sludge project using geotextile dewatering containers to reduce wet volume and produce stackable material for handling and disposal.
Review the project basis ↗
SOUTH AUSTRALIA · 2026
Port dredging sediment dewatering
Two stages · approximately 10,000 m³ in situA two-stage port sediment dewatering basis developed around a constrained wharf footprint, polymer response and marine-discharge controls.