01 · KONTAINER™ GEOBAGS
Geobag dewatering
Feasibility, material testing, bag sizing, pad and drainage layouts, filling plans and supply. For sludge, sediment, tailings and suitable process residuals.
Explore geobag systemsDewatering & containment · Australia
Design support and supply for geobag dewatering, laminated GCLs, poly liners and M2025 modular trafficable tanks.
Bring us in early. We help assess feasibility, organise relevant surveys and testing, and connect you with suitable dredging, lining and independent testing specialists. We stay involved as the project develops.
Core Products
Technical product development and supply, guided by the material, the asset and the way the job will be carried out.

01 · KONTAINER™ GEOBAGS
Feasibility, material testing, bag sizing, pad and drainage layouts, filling plans and supply. For sludge, sediment, tailings and suitable process residuals.
Explore geobag systems
02 · WASTE CONTAINMENT
Clay and polymer barrier systems for containment and capping. Select the construction, chemistry, overlaps and supporting layers for the actual application.
Explore laminated GCLs
03 · HDPE & LLDPE GEOMEMBRANES
Liner supply, material specifications and technical support, with protection and drainage layers, installation details and suitable contractor connections.
Explore poly liners
04 · M2025 · STORMWATER DETENTION
Underground tanks for on-site stormwater detention beneath car parks and other trafficable areas. Kontain can help size the tank and scope module supply, lining and installation.
Explore M2025 tanksNew free tool · 100,000–1 million dmt a year
Compare filtration, cake transport and placement with contained dewatering in the final storage position. Include upfront plant capital and explicit allowances for bag pumping, maintenance, footprint and standby capacity.
We recommend a Kontain-led review or presentation to work through the inputs with your project team. The calculator is also free to use directly.
500,000 dmt/year · 20-year example
A$10 selected operation + A$0.60 footprint and standby-pad allowances
A$4 filtration + A$6 placement + A$2 plant capital
Selected costs, not total project costs. Filtration capital assumes an installed A$20 million plant. Remaining bag equipment capital, common infrastructure and unmatched costs still need reconciliation. All assumptions are editable.
Start with the project
A product quote is often only part of the answer. Early investigation helps define what needs doing and which specialists should be involved.
Coordinate bathymetric and sludge assessments, representative sampling and dewatering trials. Use the findings to plan quantities, access, dredging, geobag layouts and material handling.
Plan a pond clean-out →Bring in appropriate liner inspection, electrical leak location and independent CQA specialists. Connect the findings with repair or installation contractors and the required material supply.
Assess a lined asset →Kontain provides the agreed feasibility, design and product-support scope. Appointed specialists deliver their surveys, installation, repairs and independent testing reports. Methods and availability are confirmed for each site.
From first discussion to delivery
You do not need a finished specification to start. Send the site problem, existing drawings or material information you already have.
Review the operating objective, available records and site constraints. Identify whether surveys, sampling or liner inspection will help define the scope.
Assess the actual material and compare practical methods. For geobags, use representative drainage testing and a limited trial where justified.
Bring the quantities, layout, material selection, access and handling plan together. Connect the project with suitable dredging, lining or testing specialists.
Supply the agreed products and support the field team. Keep specialist work scopes, QA records and each party’s responsibilities clear.
Operational dewatering
Geobags can be assessed for pond and sump clean-outs, intermittent sludge streams, temporary backup to mechanical dewatering and recovery of suitable solids. Suitability depends on drainage response, conditioning, filtrate management, footprint and the cake handling route.
Other Products
Geotextiles, geogrids, unlaminated GCLs, drainage composites, silt curtains and weed booms remain available for suitable projects.
Browse the full product range →Design & technical support
Material specifications, drawings, take-offs, testing plans and custom product formats are scoped around the project. We work with the appointed designers and contractors.
PDF · 12 PAGES · REV 3Technical capability
Ben Lewis, practising geotechnical engineer, prepares full construction drawings for the agreed tank or geobag scope and organises installation quotes, contractors and site dates.
Explore technical capability →Download the twelve-page brochure ↓Research & resources
Original research and IGS conference papers, searchable by topic. Free email-code access to full PDFs.
Browse research papers →Practical guidanceKontain’s explanations of research, material selection, installation and project lessons.
Read practical articles →Product documentsProduct data sheets, installation guides, schedules and brochures for Kontain’s supplied systems.
Find product documents →Start the conversation early