Tailings dewatering, from test sample to project supply.

Assess Kontainer™ Geobags for process tailings, existing storage clean-outs or staged dewatering capacity. Kontain connects feed testing, bag selection, pad and drainage layouts, operating limits and material supply around your project.

Establish the project basis

What limits the current tailings route?

Start with the constraint: available storage, dry-solids throughput, water recovery, footprint, capital timing or closure. A useful assessment compares complete operating routes on the same dry-tonne and project-life basis.

Kontain can help screen where geotextile container dewatering is worth testing, develop a concept and define the supply scope. An early discussion can start with approximate quantities and the information already available.

Test the tailings before fixing the layout.

Representative material testing is the starting point. Grading, feed solids, chemistry and variability inform the fabric and conditioning trial. Jar and drainage tests help establish the next trial; a pilot can then assess filling, drainage and operating behaviour with the actual feed.

Record the water-quality requirement, solids-retention objective and target condition of the retained material. Laboratory drainage alone does not establish full-scale throughput, final cake condition or suitability for stacking.

Plan the bags, pad and water pathway together.

The concept should connect the mass balance to filling cycles, resting capacity, access and the available footprint. Include pad preparation, lining and protection, drainage collection, pumping and conditioning interfaces, and the route for released water.

Kontain develops the agreed bag sizing, civil specification, layout drawings and operating inputs alongside Kontainer™ Geobags and associated material supply. Survey, testing, dredging and installation specialists can be coordinated where the project needs them, with each scope and responsibility agreed separately.

Geobag storage and filtered dry stacking need different assessments.

Geobags contain retained tailings within fabric while they dewater. Mechanical filtration generally produces a separate cake for transport and placement. A contained geobag stack should not be assumed to achieve the same moisture condition or behaviour as a filtered tailings stack.

For staged bag storage, assess foundation capacity, settlement, interfaces, drainage, filling limits, stability and closure against site-specific criteria. The appointed project team confirms the design basis and required approvals. Dry Stacked Tailings by Kontain explains the stacking method and its planning considerations.

Questions before committing

Can we discuss a project before testing is complete?

Yes. Send the available production figures, tailings information and site plan. We can identify the missing inputs and propose a practical testing and concept-development scope before quantities are fixed.

How do we compare cost fairly?

Use the same dry-solids duty and project duration. Include testing, pad works, pumping and conditioning, labour, water management, storage stages and closure as relevant to each option. The free tailings cost calculator is a starting point; arrange a guided review before relying on a project conclusion.

Can Kontain support an overseas project?

Yes. Include the country, delivery destination, programme and the engineering team leading the project. Product manufacture, logistics, local specialist support and the agreed design inputs can then be scoped around those requirements.

Tailings dewatering feasibility & supply

Put your tailings data and operating constraints in front of Kontain.