HDPE and LLDPE geomembranes
Blown film or flat die; custom widths and lengths; smooth, embossed and other textured surfaces; white or coloured constructions. Confirm the exact grade, surface data and production limits.
Custom geosynthetic manufacturing · Australia + global
From Australia, Kontain defines project-specific product requirements and coordinates manufacture through capable production partners for local and international projects. Roll and core size, strength, fabrication, laminations and quality evidence can be adjusted where the project and manufacturing pathway justify it.
Geomembrane options
Kontain sources GM13 HDPE and GM17 LLDPE options, including enhanced grades where the specification requires them. Surface, formulation, roll dimensions and supporting test evidence are agreed for the application.
Explore HDPE & LLDPE geomembranes →Combined products
A protection geotextile laminated to a liner, or an adjusted laminated GCL construction, may reduce loose-layer handling and help control placement. It can also change drainage, interface shear, repair, welding, overlap and QA requirements. Those effects are reviewed before the combined product is specified.
Development pathway
Kontain develops the technical and commercial pathway together, while keeping assumptions and departures visible.
Application, loads, ground, chemistry, geometry, construction plant, installation sequence, programme and acceptance evidence.
Set target properties, dimensions, construction, tolerances, test methods, documentation and project-specific qualifications.
Review production limits, raw materials, trial requirements, minimum quantity, timing and the evidence available for the proposed construction.
Coordinate production, agreed QA records, shipment, site sequence and technical close-out against the accepted schedule.
Engineer and laboratory input
Work with the project engineer to agree test methods, acceptance criteria, tolerances and sample traceability. Kontain can coordinate independent laboratory testing or production trials and review results before the product schedule is accepted.
Global supply and technical coordination →Clear manufacturing boundary
Any offered product or manufacturing warranty is limited to the terms stated in the project quotation and accepted product schedule. It does not replace project design, installation control, operator responsibility or verification of site conditions.
A non-standard requirement?