From calculation to project plan
The tools are one part of the dewatering basis.
Filtration trials, polymer response, geotextile and seam capacity, pad drainage, stacking, filling controls and the final solids destination still need to be connected.
01Define the feed
Wet volume, solids, chemistry, PSD, flow and treatment response.
02Run scenarios
Compare bag dimensions, cycles, polymer demand, footprint and programme.
03Verify the basis
Confirm trial data, fabric and seam requirements, fill controls and drainage.
04Price supply
Quote the number and dimensions required by the project—geobags have no general wholesale minimum order.