GCL-H · TECHNICAL DATA · DRAFT R01

Kontain GCL Heavy

A reinforced carrier with an additional nonwoven layer for more demanding installation conditions and assessed granular-fill contact.

Available with 3,700 or 4,000 g/m² dry bentonite. The reference schedule below is the 4,000 g/m² construction; confirm a separate schedule for the 3,700 g/m² option.

Reference specification.

This reference schedule concerns the 4,000 g/m² composite-base construction. The tensile test method and reporting units require confirmation before a tensile acceptance value is issued. Do not transfer another grade’s test results to this product.

PropertyMethod / basisValue
Dry bentonite mass, reference gradeASTM D5993≥4,000 g/m²
Cover / composite carrier massDeclared component values210 / 320 g/m²
Carrier constituentsDeclared component values120 g/m² woven + 200 g/m² nonwoven
Swell indexASTM D5890≥24 mL/2 g
Fluid lossASTM D5891≤18 mL
Static punctureEN ISO 12236≥2,500 N
Peel strengthASTM D6496360 N/m reference value
Hydraulic conductivityASTM D5084; test conditions to be confirmed≤3.0 × 10⁻¹¹ m/s
Index flux, q10ASTM D5887≤2.7 × 10⁻⁹ (m³/m²)/s
Hydrated peak internal shear at 10 kPa normal stressASTM D6243≥35 kPa

Review the full TDS for the construction, tolerances, test conditions and supply requirements. These values are not a statement of lot-specific conformance.

Selection and installation.

Direct crushed aggregate up to 25 mm can be considered where the actual grade, aggregate chemistry and placement method are accepted. Exclude lime-treated material and unverified limestone or carbonate-bearing fill. Assess puncture and placement; keep plant off exposed GCL. The composite carrier is not permission for unlimited rock size or an automatic slope rating.

Common rolls are 5 m × 30 m (150 m² gross). Custom dimensions, bentonite masses and plastic or steel cores are available by order. Confirm gross roll mass and clear core bore before lifting.

Provide the liner section, contact-soil grading and chemistry, liquid analysis, slope, loading, installation method and delivery requirements.

Read the illustrated installation guide →