Dewatering & geobags · 2020
Effect of Construction Sequence on the Performance of Geotextile Tubes in a Containment Bund
Original research · free full-paper access · authors credited
Research overview
A scaled field test of three side-by-side geotextile tubes found that installing the centre tube after the edge tubes reduced its dewatering rate and delayed strength development in cement-mixed soil. The arrangement, fill and scale are specific; Hyundai Engineering & Construction and Geoharbour coordinated and carried out the field tests but are not paper authors.
Kontain’s reading note. Refer to the original paper for the authors’ full methods, findings and limitations.
- Authors
- Juan Wei Koh, Soon Hoe Chew, Kok Eng Chua, Hor Mun Audrey Yim, Zi Xiang Gng
- Publication year
- 2020
- DOI
- 10.21660/2020.74.9128
- Access
- Full text at the original publisher or institutional repository.
- Reuse
- Public source PDF; redistribution permission not established
Read the full paper
Use your email and a one-time code for free access. No payment or password required. The paper opens at its publisher or repository.
Read the full paper →Search all research papers →Topics in this paper
Apply the evidence to your project
Materials, test conditions, exposure and loading matter. Research findings need project-specific assessment before use as design inputs.
Kontain provides geosynthetic supply and engineering support. Inclusion in this catalogue does not imply author endorsement or product certification.
